This week the quartz counter top for the kitchen cabinets was installed giving a crisp, clean look to the service windows. Wood roll-up doors will be installed to complete the look, and so that the kitchen can be closed off from the main Parish Hall area.
In the Nave, tiling continued on the other side of the room, and LED light bulbs were installed in our pendant fixtures.
Work on the platform area involved reworking the HVAC unit that was hidden behind the old entrance doors. There was not enough room for air ducts under the new, lower platform. So, the doors were removed and drywall was hung in their place with relocated air vents. Access to the HVAC unit will now be from the outside.