This week has been about the three P’s: plumbing, painting, and panels. Part of the concrete slab was cut out in the kitchen to replace part of a drain pipe and install the floor sink that is needed for the ice maker. New water lines were also run for the three compartment sink, hand sink, ice maker, and possible future dish washer.
Painting continued in the Parish Hall main room and classrooms.
Trim around the doors was painted in Urbane Bronze and doors got their first coat of color in Spalding Gray.
Ceiling panels have been replaced in all the drop ceilings and things are looking good!